Installed Capacity: 5.1 Mega Watts
Commisioning Year: 2009
Wind Turbines: 6
Output of each turbine: 850kW
Model: Vestas V52
Main Contractor TPF-Econoler SA (Belgium)
Location:Ngong Hills, 22km SW of capital, Nairobi - Kenya.
Standing tall at a height of 50m from the ground, the wind turbines rotate at the winds pace in a bid to generate Kenya's source of Wind Power.The Ngong Wind
No comments:
Post a Comment